BHP Billiton Worsley Alumina Pty Ltd (now South32)
A typical annual scope involves the excavation to stockpile of 1.5-2 million BCM (bulk cubic metres) of zone 1 and 2 clays; unsuitable materials; topsoil’s; gravels; and rock. Around 30-40 Ha of floor construction is also undertaken each year. This required a piped groundwater drainage system, two layers of compacted clay floor, and a gravel drainage layer encasing a piped residue draining system. Decant structures and decant lines also form part of the construction scope, either on new finished floor, or raises to existing decant structures upon an upstream embankment lift. Upstream raised embankments and dividing walls are also typically constructed each year in varying degrees. Up to 700,000 m3 of material has been successfully placed, conditioned, and compacted by B&J Catalano in a given year.
Driven by their passion to pursue delivery of the best outcomes possible, B&J Catalano senior management have always demanded a very high level of integrity from their staff.”
Engineering Projects Manager, Karara Mining Ltd
More Case Studies
Providing the best value
end to end mining & civil, transport & materials handling solutions for over 60 years
Brunswick Office: (08) 9726 8100
Hazelmere Office: (08) 9274 7676
© COPYRIGHT B&J CATALANO 2024