Karara Mining
Completed construction to raise the embankment on the tailing storage facility south of the dry stack. Works included clearing and vegetation and site preparation, top soil stripping and storage, embankment construction, installation of pipework and decant structure, construction of drains and external infrastructure.
In terms of construction equipment, B&J Catalano continually sought innovative ideas to improve. They pioneered the development of GPS systems, which provided better quality work, construction consistency and increased productivity.